In addition, we worked on replacing the PLEM (a 10-ton subsea structure used to connect pipelines for transferring oil from tankers to the terminal), which was located at a depth of 52 meters. This operation was particularly delicate due to the depth and the workload undertaken by our commercial-divers, as hydraulic tools were needed to remove the bolts and subsequently install and torque them.
After nearly 900 days of operations in the Valparaíso Region, we wrapped up our work in November. We would like to thank the crew of our A/N Yagana, Francisca Ignacia, and our OOMM Commercial Diving Team.