Oxxean-mooring-installation
Once the initial mooring is installed, the metal structure of the cage rafts is positioned, after which all remaining moorings required are installed to ensure safe operation throughout the production cycle.
Throughout the process, inspection checks are carried out using subsea robotics, through which we ensure that the installation process complies with the standards requested by the client and those established in the regulations currently in force in our country.



