Installation of Galleries and Shiploader Structure – Patillos Port

Tarapacá Region

Installation of Galleries and Shiploader Structure – Patillos Port

In the Tarapacá Region, services were provided for the reconstruction project of Terminal 1 at Patillos Port. This involved assembling a 180-ton shiploader on the deck of the Yagana Crane Barge for subsequent hoisting and precision installation using the Clyde crane.

Other Projects