Seawater intake assembly PROJECT C20+ – Minería Inés de Collahuasi

Seawater intake assembly PROJECT C20+ - Minería Inés de Collahuasi

The C20+ project involved the construction of a desalination plant with a seawater intake capacity of 1,050 l/s.

To this end, operations were performed to load, transport, and assemble underwater the structures that make up the desalination plant’s seawater intake system. This structure was assembled on the deck of the Yagana crane barge and then installed.

The project was successfully executed, meeting all technical, operational, and safety objectives.