Puelche Project

Puelche Project

The Puelche Center project, located in the township of Puelche in the Los Lagos Region, involved the installation of 14 40 x 40 meters metal cages, equipped with 76 20-ton mooring lines for the fish farm.

In addition, a 300-ton pontoon was installed, which features
40-ton mooring lines designed to ensure its anchorage and operational stability.

As a Company, we ensure the stability and safety of the mooring system by verifying that each component is installed in accordance with technical specifications and current Regulation 1821.

Other Projects