Teresa 1 Site

Teresa 1 Site

At the Teresa 1 Center project, located on Teresa Island in the Guaitecas Archipelago, Aysén Region, we carried out the retrieval of a module consisting of 16 cages from the previous production cycle, which included 32 mooring lines with standard 20-ton mooring blocks, installed in 2021.

Subsequently, 16 metal cages measuring 30 x 30 meters were installed, with a total of 44 mooring lines, using standard 20- and 15-ton blocks respectively.

Additionally, a 200-ton eye-bolt pontoon was installed, along with the implementation of its ensilage system.

Adicionalmente, la instalación de un pontón de cáncamo de 200 toneladas, junto con la implementación de su sistema de ensilaje.