Center Gala 5 – AquaChile

Technical rigor, commitment, and a successful closure.

Center Gala 5 – AquaChile

The Gala 5 project for our client AquaChile was a resounding operational success, establishing itself as one of the most complex mooring challenges in recent times. The plan involved the installation of 49 lines in total: 39 lines for the 8-cage module (40x40), 8 lines for the pontoon, and 2 for the silage.

Developing this deployment at a high-exposure site required pushing our technical capabilities to the limit, executing highly complex maneuvers such as anchoring lines at depths exceeding 1,600 meters and installing underwater bolts using commercial diving. The work of the vessels Compas 23 and Tulio Sebastián was crucial to achieving this objective. The skill, dedication, and professionalism of the crews of both ships, combined with the impeccable coordination of the operations team, allowed us to overcome the technical demands and the on-site re-establishment of the northern end lines of the module.

Likewise, the project demanded rigorous operational management and constant dialogue with the client, the maritime authority, and local fishermen to ensure the proper execution of the work. Meeting the high standards required, daily monitoring and reporting were maintained throughout the entire installation process.

The successful completion of this challenging project, coupled with the effort, operational flexibility, and resilience demonstrated by the entire team, resulted in the complete and timely acceptance by AquaChile, demonstrating their total satisfaction and gratitude for the professionalism and quality of the work carried out on the project.

Other Projects